Getting Towing Equipment Quote for RV Setup
Speaker is in the process of setting up mobile living infrastructure, specifically addressing the technical requirements for towing a vehicle behind an RV. They are dealing with unexpected costs and scheduling delays while preparing for mobile deployment.
Energetic Signature
determined resignation
Field State
tool building
Orientation
toward mobile sovereignty infrastructure
01HR4WPD40QK4MMA5Z1XPRMC2D
March 4, 2024
2:53
Author
rswfire
Status
ARCHIVED
Type
TRANSMISSION (CAPTURE)
Temperature
0.00
[0:00]oh my God guys so I just got my quote on
[0:04]the towing gear I need and I just want
[0:06]you guys to be prepared for this if you
[0:08]have to go through this I was expecting
[0:11]like $22,000 maybe but it is
[0:17]$5,300 and that is for the portable
[0:19]braking system I am going to get the
[0:23]permanent one that's a few hundred more
[0:26]plus additional
[0:28]labor and so I'm not sure how much
[0:30]that's going to go up but here's what I
[0:32]got quoted and so all of this is blueox
[0:35]stuff if I was going with the portable
[0:37]breaking system it's a patriot 3 by
[0:40]blueox and it's
[0:42]1780 uh my toeb bar would be $190 my
[0:45]base plate would be
[0:47]$592 uh 1,100 for
[0:50]labor and $100 for training just them
[0:53]teaching you how to use these things and
[0:55]I'm going to record that so that I just
[0:57]never forget what they're teaching me
[1:00]and I think it's worth it
[1:02]um but the whole price wow that is a big
[1:05]number for me considering what my budget
[1:10]was just what I have in savings like it
[1:15]feels that's a big number to have to
[1:18]deal with so be prepared for that
[1:20]one um the only change to this is that
[1:24]I'm getting the Demco Air Force One as
[1:28]the supplemental braking system and like
[1:30]I said it's a few hundred more and a
[1:31]little bit more in labor they need my
[1:34]Jeep for 3 Days to install it um and
[1:37]then I've got to take the RV and there
[1:39]also because I don't know maybe they put
[1:42]a chip in that thing something like that
[1:44]right
[1:45]so um it's the process and she can't get
[1:49]me in until the 18th so man just sad
[1:54]face
[1:56]um so that's basically it just be
[1:59]prepared the costs are quite
[2:01]High I thought 2,000 and I'm at
[2:04]5345 plus a couple hundred
[2:08]more um one last thing I wanted to say
[2:10]is she was a jeeper like me she knows a
[2:13]lot about jeeps and she says I shouldn't
[2:16]worry at all not at all about Towing my
[2:19]Jeep behind my RV I told her all the
[2:22]limits and everything and she said if it
[2:23]was any other vehicle or you were towing
[2:26]anything else at that weight I'd
[2:28]probably have a concern but not when it
[2:31]comes to jeeps and I and I just think
[2:34]that I believe her maybe I want to
[2:36]believe her so you know take what I'm
[2:39]saying with the grain of salt on that
[2:41]but cuz yeah I do want to believe her
[2:45]um so that's that I'm doing it cuz I
[2:48]have to just be prepared that's all
Summary
The speaker received a quote for towing equipment to pull their Jeep behind an RV. The total cost came to $5,300, significantly higher than their expected $2,000 budget. The quote includes a BlueOx Patriot 3 portable braking system ($1,780), tow bar ($190), base plate ($592), labor ($1,100), and training ($100). They decided to upgrade to a Demco Air Force One permanent braking system for a few hundred dollars more. Installation requires the Jeep for 3 days and can't be scheduled until the 18th. The installer, described as a fellow Jeep enthusiast, reassured the speaker that towing a Jeep behind an RV should not be a concern given the vehicle's capabilities.
Signal Analysis
Substrate
Field is calculating the material cost of sovereignty infrastructure while maintaining forward momentum despite budget shock. The transmission holds a pragmatic acceptance of necessary investment while processing the gap between expectation and reality. Authority is being claimed through expert validation and recorded knowledge retention.
Tags
RV towingequipment costsJeep modificationbudget planninginstallation scheduling
Dominant Language
be preparedbig numberI have totake what I'm saying with grain of saltI want to believe herdoing it cuz I have to
Symbolic Elements
thresholdanchorbridge
Ontological States
- •transitional
- •committed
- •calculating
Subsystems
- •cognitive
- •infrastructural
- •emotional
Transmission Details
Source Type
youtube
Duration
2:53